VC-25 Avionics Modernization Program
Abstract
A. Mission Description and Budget Item Justification October 2017, VC-25A Avionics Modernization Program (AMP) was de-scoped from upgrading the flight deck avionics to compliance with the mandates for civil Automatic Dependent Surveillance-Broadcast (ADS-B) Out and DoD Identification Friend or Foe (IFF) Mode 5 capability supporting the President of the United States as Head of State, Chief Executive, and Commander in Chief. Installations are aligned with the aircraft heavy maintenance (HM) schedule. The de-scoped AMP requirements to ADS-B Out and IFF Mode 5 must integrate the 2020 mandate capability in HM18-8 and HM20-9 utilizing the remaining FY18 and FY19 funds for test, tech data integration, SIL, field team and other government costs. The National Security Waiver signed by Secretary of the Air Force 11 Dec 18 included the capability for ADS-B Out and IFF Mode 5 full FAA compliance 2025, which would utilize procurement funds but has not been funded. As directed in the FY 2018 NDAA, Sec 825, amendment to PL 114-92 FY 2016 NDAA, Sec 828 Penalty for Cost Overruns, the FY 2018 Air Force penalty total is $14.373M. The calculated percentage reduction to each research, development, test and evaluation and procurement account will be allocated proportionally from all programs, projects, or activities under such account. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2020
- Source ID
- 676024_0401314F_7_3600_PB_2020
Related Documents
- Root: Operational Support Airlift
- Child Accomplishment: Design and Test
- Child Cost Item: 445cddae0e27c92b8e2ffe063953b093
- Child Cost Item: 569003337e7003370a55ed6f44dc6258