T-6 Operational System Development

Abstract

T-6 Operational System Development continues follow on development activities to JPATS including studies & development efforts to support future ACAT III Engineering Change Proposals (ECPs) to the T-6 Aircraft, instructional courseware, and logistics support to include Diminishing Manufacturing Sources and Material Shortages (DMSMS) and development activities related to DMSMS. Included is development for the FAA mandated ACAT III program for ADS-B Out and associated upgrades. Also included is development of the aircraft Mission Planning System (MPS) support to obtain Joint Mission Planning System (JMPS) currency and certification for T-6 flight operations. The JMPS requirements are levied from outside the T-6 JPATS program office and may or may not correlate with block upgrade requirements.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2016
Source ID
676035_0604233F_7_3600_PB_2016

Tags

Readers

  • Aerospace Engineering
  • Instructional Design and Training Evaluation.
  • Software Engineering

Related Documents