Test and Evaluation (T&E)
Abstract
The T&E process will be a complete system operational test to determine DEAMS effectiveness, suitability, and mission capability using the R12 Upgrade. It begins with validation of requirements and end to end functional capabilities including compliance mandates. The T&E effort are conducted in developer sites, Air Force test sites, DISA production sites, and user locations. The DEAMS Test and Evaluation Master Plan (TEMP), Lead Developmental Test Organization (LDTO) Integrated Test Plan (ITP), System Integrators (SIs) Software Test Plans (STPs), and Operational Test Agency (OTA) operational test plans covers the details of Increment 1 T&E. Database Administrator (DBA) Test Support required to service test instances. Capabilities Integration Environment (CIE) Integration/Development support for ancillary Test activities required. Hardware and software required for test activities. The T&E effort for the Agile Pilot Program includes Sprint Testing where functionality developed code in the sprint is tested for conformance to functional and non-functional requirements. Sprint Testing shall address unit and integrated testing. Additionally, there will be Regression Testing to validate that the work within the sprint has not introduced defects into areas of the product not directly impacted by the work of the sprint and has not introduced defects into cross-product dependencies such as interfaces.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2020
- Source ID
- 695dbaac036bfffa63ac784efb0e6eb5