SACCS Replacement - FY16 New Start

Abstract

Phase I: Design and develop replacement SACCS accountable processors (e.g. Subnet/Base Communication Processor (SCP/BCP)) that disseminate National Command Authority messages to nuclear forces. Phase II: Design and develop replacement end user equipment to support the nuclear mission. New equipment will improve Mean Time Between Failure rates, cost savings, reliability, availability, improve user interface, address Diminishing Manufacturing Sources and Material Shortages and obsolecence challenges, and meet Chairman Joint Chief of Staff Nuclear Technical Performance Criteria and Operational Standards (CJCSI 6811.01).

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2016
Source ID
6b3bc8ab635610aa33dffc6db5dbec8e

Tags

Readers

  • Enterprise Information Systems Architecture and Joint Command Capability Interoperability Support.
  • Logistics and Supply Chain Management.
  • Software Engineering

Related Documents