Design development, developmental testing, operational testing.

Abstract

While cancelling the EFV program, FY11 funds were utilized to support and complete certain development and testing efforts that will be integral to future amphibious vehicle development. FY11 funded reliability growth design and development, reliability growth testing, and engineering and logistics support through KP-2. The completion of these efforts are providing validated systems engineering and process models and initial design data valuable to the development of future Marine Corps requirements.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2013
Source ID
6d00e4439fd39ba5e1afaec62baf8781

Tags

Fields of Study

  • Engineering

Readers

  • Maritime and Naval Warfare Studies
  • Software Engineering

Related Documents