GPS III Follow-On (Production Readiness)
Abstract
Under Secretary of Defense for Acquisition, Technology, and Logistics USD(AT&L) approved the first phase of a two-phased GPS III Follow-On Acquisition Strategy starting no earlier than SV 11. The strategy utilizes FY 2015-2017 RDT&E funding for the Phase 1 effort to mature three contractors'; GPS III Follow-On production designs. The Phase 1 Production Readiness Feasibility Assessment is providing data and insight into contractors GPS III Follow-On Production Design with emphasis on a mature navigation payload and production ready designs. Phase 1 requires contractors to provide a GPS III Follow-On SV and navigation payload production designs, manufacturing plans, and a navigation payload engineering brass board (hardware).