GPS III Follow-On (Production Readiness)

Abstract

Under Secretary of Defense for Acquisition, Technology, and Logistics USD(AT&L) approved the first phase of a two-phased GPS III Follow-On Acquisition Strategy starting no earlier than SV 11. The strategy utilizes FY 2015-2017 RDT&E funding for the Phase 1 effort to mature three contractors'; GPS III Follow-On production designs. The Phase 1 Production Readiness Feasibility Assessment is providing data and insight into contractors GPS III Follow-On Production Design with emphasis on a mature navigation payload and production ready designs. Phase 1 requires contractors to provide a GPS III Follow-On SV and navigation payload production designs, manufacturing plans, and a navigation payload engineering brass board (hardware).

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2020
Source ID
7100bb4d5e95b69f7ad991ce39d95b03

Tags

Readers

  • Military Science and Technology Research and Modernization.
  • Nuclear Civil Defense.
  • Software Engineering

Technology Areas

  • Space

Related Documents