Ground Test Execution
Abstract
Ground Test (GT) Execution includes: - THAAD participation in Missile Defense System GT operational scenario events to validate THAAD's ability to conduct coordinated engagements with Aegis and PATRIOT operating with C2BMC and AN/TPY-2. - Pre-mission planning, pre- and post-mission analyses, reporting, and execution to support Missile Defense System Ground and Flight Test campaigns. - GT of element hardware and software prior to hardware-in-the-loop testing and enable a continuous capacity based Sprint vs. lengthy individual GT campaign environment, enabling a more efficient process for ground testing and reducing test cycle time. - Continued performance assessments to evaluate system performance and interoperability within the Missile Defense System. - Participation in Wargames and Exercises that support the Combatant Commands with modeling and simulations and subject matter expertise during exercise events. Continue to assist in developing/refining Tactics, Techniques, and Procedures and Pre-Planned Responses to incorporate in future events. Demonstrate THAAD capability to the warfighter community in the Integrated Air and Missile Defense environment. Specific and/or unique planned accomplishments to each FY are as follows:
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2025
- Source ID
- 79748aadfd2a6ab061c26b27aa4c9284