Ground Updates

Abstract

Modify and upgrade the existing EPS Control and Planning Segment (CAPS) to provide command and control and XDR mission planning capability for the two new payloads.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2025
Source ID
7cf6de4dae363bd6d1d4af8accba1425

Tags

Fields of Study

  • Physics

Technology Areas

  • Fully Networked C3
  • Fully Networked C3 - Command and Control

Related Documents