T62 Auxiliary Power Unit (APU)

Abstract

Provide timely responses to technical problems arising in the field during operational use. Review operational and repair reports, perform engineering analysis of failed engines and equipment. Perform investigation and testing as required to isolate/verify reported field problems and service revealed deficiencies (SRDs).

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2015
Source ID
7cf6e53e2bce56d2cb97ee6b38dd3d5f

Tags

Fields of Study

  • Engineering

Readers

  • Electrical Engineering
  • Logistics and Supply Chain Management.
  • Systems Analysis and Design

Related Documents