Test and Evaluation
Abstract
Integrated Test activities in support of Block 4, to include Lockheed Martin and Pratt & Whitney support at all test sites. Non-recurring engineering required to plan for the service life extension of existing DT aircraft and modification necessary to bring DT aircraft fleet to a more production representative and sustainable configuration, and to develop flight test instrumentation and release test software to meet Block 4 requirements. Additional upgrades required to support development and evaluation of improvements driven by changes in the threat environment and as identified in the Electronic Warfare ICD, the Fifth Generation Fighter Modernization ICS, and the Block 4 Capability Development Document (CDD). Efforts include non-recurring engineering and procurement of a test article to evaluate service life of F-35B STOVL Aircraft.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2021
- Source ID
- 8b12c080b21f94b83f174765324e7e5e
Related Documents
- Root: (U)F-35B C2D2