Military Construction Mission Unique Equipment (MUE)

Abstract

ATEC was programmed one MILCON project a year from FY18 through FY20. MUE includes items that are movable and not affixed as an integral part of the MILCON facility, but are required to perform the mission of the facility and are required to be provided by the mission activity. In 2019, ATEC's FY18 and FY19 MILCON projects were deferred due to the National Emergency at the Southern Border, but were subsequently restored by the SECDEF; one each in FY20 and FY21.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2023
Source ID
8bbf7d0f2751def8cd6515163dce5b4b

Tags

Readers

  • Aerospace Test and Evaluation
  • Defense Financial Management and Audit.
  • Electrical Engineering

Related Documents