LCS Test & Evaluation

Abstract

Execute formal LCS Test and Evaluation (T&E) program, Developmental Testing and Operational Testing (DT/OT) including Live Fire Test and Evaluation (LFT&E) and procurement of T&E Ordnance. Developmental Test and Evaluation (DT&E) will concentrate on verifying integration and interoperability of employed technologies and systems in the Sea Frame designs and modular mission packages to achieve the mission capabilities and performance requirements as defined in the LCS Program's Capabilities Development Document (CDD). DT&E functions will include the evaluation of Critical Technical Parameters (CTP), Measures of Effectiveness (MOE), Measures of Suitability (MOS), and Key Performance Parameters (KPP) for the core Seaframe and the focused missions. Operational Testing for the LCS will be conducted in multiple phases; multiple phases of Initial Operational Test and Evaluation (IOT&E) on each Seaframe design to support the development of the initial seaframe deliveries and a specific mission package, and Follow-on Operational Test and Evaluation (FOT&E), as required, when new capabilities are developed or refined.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2011
Source ID
8c35c1192ca8b7b3971581f15f392f1b

Tags

Readers

  • Aerospace Test and Evaluation
  • Naval Mine Countermeasure Systems Development.

Technology Areas

  • 5G
  • 5G - DoD 5G Program

Related Documents