Product Development - LRIP Phase Contractor Technical Support to Government Test
Abstract
MPF Low Rate Initial Production (LRIP) phase development activities for Contractor Technical Support to Test include purchase of the spare parts for LRIP phase testing, root cause analysis and the development of corrective actions on test incidents, training of vehicle operators at U.S. Government test sites, initiation of vehicle lethality, survivability, and weight reduction integration efforts, and integration of system design changes informed by user feedback. Efforts also include Systems Technical Support (STS) in the form of test configuration updates to MPF vehicle subsystems and field service representatives at U.S. Government test sites to perform MPF vehicle maintenance.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2024
- Source ID
- 93324d565c3a94928e50f066032cfd0b