LGM-30G Higher Authority Command Test System (HACTS) 2.0

Abstract

The MM III HACTS 2.0 program replaces obsolete/unsupportable communication system test equipment located at test facilities. HACTS laptops are past their vendor support life and require battery replacement. Due to its battery being non-user serviceable, the need for battery factory service makes the laptop units candidates for replacement. Although the HACTS laptop processor is "ruggedized”, its design life is only approximately four years. The replacement must be compatible with operating system updates as mandated by the Risk Management Framework. Incorporating the Weapons System Console Equipment Simulator into the HACTS enables a single hardware platform to execute both software functions, thus reducing the number of hardware devices the Government must maintain. The EMD phase will produce two refurbished units.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2025
Source ID
9517dfdf2687eb9a65bb4111b17f222b

Tags

Readers

  • Civilian Systems Systems Program Capability Development and Upgrade Support Activity Expense and Pay Management.
  • Computer Science/Computer Engineering/Data Science/Digital Signal Processing.
  • Software Engineering

Related Documents