CONECT

Abstract

Continued Diminishing Manufacturing Source (DMS) redesign development and test effort. Continued engineering design of CONECT capability into the B-52 training systems. Began incorporating changes required due to updates in Government Furnished Equipment (GFE) and crypto modernization requirements. Incorporated/integrated CONECT with recurring updates of the B-52 software baseline. As the CONECT upgrade brings additional capability to the B-52, emerging communication and security requirements (upgrades to the IBR, JRE messages, crypto modernization, etc.) and aircraft upgrades (1760 Internal Weapons Bay Upgrade, Mode S/Mode 5 IFF, etc.) may require study for potential impacts to CONECT. CONECT will update the existing trainers or use computer-based training to add CONECT functionality to meet user-training requirements, and update/maintain the SIL for the WST.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2016
Source ID
960050173efa1d9034e0cbe0e69153f5

Tags

Readers

  • Canine Service Warrior Training Program for Wounded Warriors in the Veterinary Industry, Supported by Donors.
  • Naval Mine Countermeasure Systems Development.

Related Documents