Next-Gen OPIR Space, Integration

Abstract

The Integration (Project 657123) project includes the efforts associated with the Government's primary role and tasks necessary to accomplish the critical lead system integration function with the OPIR enterprise material segments (Next-Gen Geosynchronous Earth Orbit (GEO) (NGG), Next-Gen Polar (NGP), Next-Gen Ground, and the Resilient Missile Warning/Missile Track (MW/MT) architecture). The Next-Gen OPIR Program Manager is responsible for directing the Next-Gen OPIR current Enterprise architecture, system definition, controls and validates interfaces, ensures compatibility of Next-Gen systems, and develops/manages plans for execution and fielding of the Next-Gen OPIR Enterprise.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2024
Source ID
98f8294c984b028b72eb7b9a068e4717

Tags

Readers

  • Aerospace Engineering.

Technology Areas

  • Space
  • Space - Satellites

Related Documents