Congressional Adds
Abstract
This project supports the costs associated with the research and development of expeditionary logistics capabilities such as the Expeditionary Fabrication (XFAB) Facility and Tactical Fabrication (TACFAB) suite in support of Expeditionary Advanced Base Operations and Distributed Operations. The project supports the investment to develop the digital infrastructure required to support the implementation of 3D printing; the 3D printing of expeditionary capabilities such as buildings, bridges, ship-to-shore landing crafts and other large scale constructs; the characterization of material that can be used for repair parts and potential feedstock to include the use of discarded materials on the battlefield; engineering analysis and testing; and innovation/problem solving training to enable Marines to leverage advanced manufacturing technologies. The Expeditionary Logistics Initiative will give Marine units access to additive manufacturing techniques to allow them the opportunity to exercise innovation to resolve issues affecting unit combat readiness in austere environments. This effort supports the development of procedures to enable the approval and manufacturing of items requested from Marines and incorporates the development of strategic partnerships with other DoN Systems Commands and field activities to exploit additive manufacturing technologies in support of our Naval Forces. The Predictive Maintenance for Navy and Marine Corps Weapons Systems initiative supports the Condition-Based Maintenance (CBM+). CBM+ is a collaborative DoD readiness initiative focused on the development and implementation of data analysis and sustainment technology capabilities to improve weapon system availability and achieve optimum costs across the enterprise. CBM+ is the application and integration of processes, technologies, and knowledge-based capabilities to improve the reliability and maintenance effectiveness of DoD systems and components. CBM+ includes both hardware and software components or the Military Equipment (ME) to be capable of monitoring, collecting, and transferring system data.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2023
- Source ID
- 9999_0604289M_4_1319_PB_2023
Related Documents
- Root: Expeditionary Logistics
- Child Cost Item: c14fb50d1c46d3d73a9aded12184f1b9
- Child Cost Item: b16248d1ed1540496e249297a21ce757
- Child Cost Item: 1edacfd88a3f1c6e45d7bb78f1186872
- Child Cost Item: 8ca1241dbeb827c0bfbd2acb8f2be461
- Child Cost Item: aada1a087eef7a2f21e95e6f60759768
- Child Cost Item: 4168c44c9722c5df289d05f6ba9156a3
- Child Cost Item: 82efd66c132bbfe4abd77a79636b2ebc
- Child Cost Item: 9803d7866e382c8c6745294dbbb990e9
- Child Cost Item: 05ae2f228bb00ae367b7b98c136afcfa
- Child Cost Item: d4f289a2ebefe3ebd7782ae26f63c845
- Child Cost Item: 1f0aa4cec06d3df8d0cc9726611e6a93
- Child Cost Item: d73c1c3bf24cc06cdff3a4956d945456
- Child Cost Item: 060a1d0a7b3e692b634741a10824e6c8
- Child Cost Item: 1545d93f6f21d9e562c79674531d94dc
- Child Cost Item: d2b42c109e232093207e5141835483a8
- Child Cost Item: aabe6fc449784e5ed67cbefb67288f0f
- Child Cost Item: ae669d4c686cb9fe1acd09ded4a1ad7d
- Child Cost Item: c1d32916f59879b6778b4b59dc222fca
- Child Cost Item: cfd5255c4d002df2eff30ef86f52bfb7
- Child Cost Item: 61a92baa1768dace790c447a81c51074
- Child Cost Item: 71d48bb045f93966ce2ddbf6d0106457
- Child Cost Item: cabfb159ae7732972c507f2e98d8437a
- Child Cost Item: 5566cce0be740d1cde5240c86afabf22
- Child Cost Item: b05f5fcd866219dc68d615eed8a332c8
- Child Cost Item: cb50ac6fe52677a55c54b95ec4458816
- Child Cost Item: f62fb12897648f159757a57b3328cbce
- Child Cost Item: 40fb52505260a18282d6e2b745d88287