Logistics Suppport

Abstract

Received/controlled/distributed/tracked Program/Product Manager (PM) test assets; maintained/repaired/replaced/upgraded test floor; procured test equipment.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2012
Source ID
9bbf648a2476b4f0b0baaeb495d8f616

Tags

Fields of Study

  • Engineering

Related Documents