Outfitting and Post Delivery
Abstract
Provides for the completion of ship outfitting to include: (a) ship provisioning and fuel, (b) initial load-out of repair parts, spares, and test equipment in accordance with allowance list, (c) provision of technical manuals and required drawings, (d) installation and validation of PMS and EOSS, and (e) crew training and completion of ship system certification requirements. Implements instrumentation packages and validates structural, sea keeping, and hydrodynamic performance. Provides emergent support during the execution of Post Delivery Test & Trials (PDT&T) and Post-Shakedown Availability (PSA). Incorporates Engineering Change Proposals (ECPs) to correct trial card deficiencies, and mission critical upgrades (as required).
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2014
- Source ID
- 9d5d71501cdfbedcbecf6ca5316cbd8c