Progress Report 1 October-30 November 1952. Contract No. N7 ONR-35805 (Brown Univ.)
Abstract
An adjustable center body located downstream and a flexible wall nozzle installed upstream eliminated flow instabilities and increased the Mach no. range of the transonic section.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1952
- Accession Number
- AD0002954
Entities
People
- P. F. Maeder
Organizations
- Brown University