MINEFIELD CLEARANCE

Abstract

The purpose of the project is to develop a full-scale rudimentary test model device for the emplacement of small point charges. A complete working model is then to be produced to meet performance specifications.

Document Details

Document Type
Technical Report
Publication Date
May 20, 1953
Accession Number
AD0012601

Tags

DTIC Thesaurus Topics

  • Clearances
  • Defense Systems
  • Emplacement
  • Mine Warfare
  • Minefields
  • Passive Defense
  • Specifications
  • Standards

Readers

  • Explosive Engineering.
  • Software Engineering