FEASIBILITY STUDY OF AN ADJUSTABLE CAUSEWAY

Abstract

An attempt was made to develop a 21-ft wide NL pontoon causeway capable of being end-to-end connected as a means for providing an improved causeway for handling 60-ton loads from LST's to shore. The following effort supports this objective: To investigate methods for providing an adjustable causeway section for use with the 3 x 15 pontoon causeway. Various concepts of adjusting a causeway section length are considered with respect to desirable characteristics. Those having merit are further reviewed to arrive at the most feasible concept. A feasible concept is presented. (Author)

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1961
Accession Number
AD0253975

Entities

People

  • J.j. Hromadik

Organizations

  • Naval Facilities Engineering Service Center

Tags

DTIC Thesaurus Topics

  • Bridges
  • Causeways
  • Feasibility Studies
  • Infrastructure
  • Land Transportation Infrastructure

Readers

  • Computational Modeling and Simulation
  • Naval Architecture and Marine Engineering.
  • Theoretical Analysis.