PRELIMINARY INVESTIGATION OF SM-1 CONTROL ROD SEAL FAILURE

Abstract

On 26 March, the SM-1 plant experienced excessive control rod drive seal leakage rate. During a vapor container entry for instrumentation check, the leakage rate from each seal was measured. The maximum rate was found to be 6.3 gallons per hour compard to a normal valus of approximately .7 gph. Two seals were replaced with rebuilt assemblies. This reduced leakage rates to an allowable operating rate. Shim no. 3 seal was found plugged, and back flushing eliminated the plugging. Visual inspection of the disassembled Rod-B seal indicated leakage increase was due to the increased clearance probably caused by overheating due to loss of cooling water at various times in the operating period.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 18, 1961
Accession Number
AD0259803

Entities

People

  • G. W. Knighton

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Assembly
  • Clearances
  • Control Rods
  • Engineering
  • Engineers
  • Government Procurement
  • Governments
  • High Pressure
  • Inspection
  • Materials
  • Measurement
  • New York
  • Nuclear Energy
  • Quadrants
  • United States
  • Virginia
  • Visual Inspection

Readers

  • Aerospace Engineering
  • Electrical Engineering
  • Environmental Engineering