INDUSTRIAL PREPAREDNESS STUDY ON DEVICES 1, 13, 14, 15
Abstract
Work on Device 1 was com leted. The production phase testing program and the pilot run requirements for the PNP version of devices 13 and 14 were completed and the line shut down. Production testing for these units was initiated. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 30, 1961
- Accession Number
- AD0260508
Entities
People
- H. Meisel
- L.b. Balents