DEVELOPMENT OF TELETYPEWRITER TEST SET, AN/UGM-2

Abstract

Work on teletypewriter test set AN/UGM-2 progressed from the engineering-test-model to the service-test-model phase. Electrical and mechanical design specifications are essentially firm. F rther study and evaluation of several Signal Corps suggestions should determine the practicability of their inclusion in the final design. Fabrication of ten service test models of the AN/UGM-2 was begun. (Author)

Document Details

Document Type
Technical Report
Publication Date
Apr 30, 1961
Accession Number
AD0261410

Entities

People

  • L.o. Richards
  • R. Mottino

Tags

DTIC Thesaurus Topics

  • Engineering
  • Fabrication
  • Inclusions
  • Specifications
  • Teletypewriters
  • Test And Evaluation
  • Test Sets

Readers

  • Software Engineering