DEVELOPMENT OF PRODUCTION PROCESSES AND TECHNIQUES FOR L1951 COAXIAL MAGNETRON

Abstract

The refinement for production of the L1951 coaxial magnetron resulted in the full realization of the excellent performance capabilities of its novel design principle. A pilot production line was established and operated to produce these magnetrons at the rate of 2 per day at an over-all yield of 66%. Fifty-four tubes were constructed on the pilot line and met all the performance requirements. Nine tubes were life tested, resulting in an average life in excess of 500 hours. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1961
Accession Number
AD0261761

Entities

People

  • S.o. Ekstrand

Tags

DTIC Thesaurus Topics

  • Electrical Equipment
  • Electron Tubes
  • Electronic Equipment
  • Magnetrons
  • Production

Readers

  • Mathematics or Statistics
  • Microwave Engineering.
  • Naval Engineering and Maritime Security