A STUDY AND EVALUATION OF LIQUID-LEVEL AND LIQUID-VOLUME CONTROLS FOR SHELL-, ROCKET-, AND BOMB-FILLING MACHINES

Abstract

The basic construction of the filling system that weighs the desired amount of liquid in an inter ediate chamber is completed, except for the automatic-sequencing control equipment. Initial tests have been made of this system, and overfilling results. To remove this undesirable effect, modificati n of the servo system and valve-operating mechani m is necessary. Several such modifications are pr posed and are, or will be, effected.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 31, 1952
Accession Number
AD0264090

Entities

People

  • Thomas M. Boland
  • William Hecox

Organizations

  • Battelle Memorial Institute

Tags

Communities of Interest

  • Counter IED
  • Counter WMD
  • Weapons Technologies

DTIC Thesaurus Topics

  • Construction
  • Contracts
  • Control Systems
  • Electrical Engineering
  • Engineering
  • Flow Rate
  • Government Procurement
  • Governments
  • Machines
  • Procurement
  • Prototypes
  • Radiological Laboratories
  • Servomotors
  • Solenoid Valves
  • Test And Evaluation
  • Valves

Readers

  • Allergy and Immunology.
  • Software Engineering
  • Systems Analysis and Design