SUPER-POWER KLYSTRON TUBE-TEST FACILITY
Abstract
Effort was made to complete the construction of the switch tube test supply in order to expedite the switch tube test program. The magnet supplies were completed as well as the body and collector-capacitor banks. The interim modulator power supply and crowbar circuitry, with the exception of the final assembly of the crowbar logic circuitry, was made available for test. A significant amount of panel work was completed and these panels were wired for installation in the control console. (Author) This report includes: Machlett Labs., Inc., Springdale, Conn. DEVELOPMENT OF A 350-kV, 25-AMPERE PULBE TRIODE, by H. Langer and C. V. Weden. Quarterly rept. no. 3, 1 Apr-30 June 61. (Subcontract to Radiation at Stanford, Palo Alto, Calif.)