SUPER-POWER KLYSTRON TUBE-TEST FACILITY

Abstract

Effort was made to complete the construction of the switch tube test supply in order to expedite the switch tube test program. The magnet supplies were completed as well as the body and collector-capacitor banks. The interim modulator power supply and crowbar circuitry, with the exception of the final assembly of the crowbar logic circuitry, was made available for test. A significant amount of panel work was completed and these panels were wired for installation in the control console. (Author) This report includes: Machlett Labs., Inc., Springdale, Conn. DEVELOPMENT OF A 350-kV, 25-AMPERE PULBE TRIODE, by H. Langer and C. V. Weden. Quarterly rept. no. 3, 1 Apr-30 June 61. (Subcontract to Radiation at Stanford, Palo Alto, Calif.)

Document Details

Document Type
Technical Report
Publication Date
Jun 30, 1961
Accession Number
AD0264142

Entities

People

  • Roby L. Blessing

Tags

DTIC Thesaurus Topics

  • Accumulators
  • Assembly
  • Buildings And Structures
  • Capacitors
  • Construction
  • Electronic Equipment
  • Fabrication
  • Klystrons
  • Modulators
  • Power Supplies
  • Radiation
  • Research Facilities
  • Test Facilities

Fields of Study

  • Physics

Readers

  • Electrical Engineering
  • Electronics Engineering
  • Marine Propulsion Engineering and Naval Architecture