CATEGORY II YJ AND J85-GE-5 ENGINE FOLLOW-ON EVALUATIONS
Abstract
Evaluations were made of (1) YJ engine component improvements, (2) J engines in the production configuration being delivered in the first operational T-38 aircraft, and (3) a modified production J engine (General Electric Operation Nutcracker.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 01, 1961
- Accession Number
- AD0266168
Entities
People
- Swart H. Nelson
- Thomas H. Hobbs
Organizations
- Air Force Test Center