PRODUCTION ENGINEERING MEASURE FOR TYPE FW-202 BARRIER-GRID STORAGE TUBE
Abstract
Efforts are being directed toward a production engineering measure (PEM) for the FW-202 barrier-grid storage tube. The PEM program is in 3 phases; the preliminary engineering phase and the preproduction and pilot production phases. Preventive maintenance on the test equipment was completed. Investigations started on the use of low temperature alloys as a bonding agent between the barrier-grid mesh and the SE surface. Preliminary design was completed for mounting of the collector-amplifier section on a seal ring. An electronic evaporator was ordered and service installations were completed. (Author)