PRODUCTION ENGINEERING MEASURE FOR TYPE FW-202 BARRIER-GRID STORAGE TUBE

Abstract

Efforts are being directed toward a production engineering measure (PEM) for the FW-202 barrier-grid storage tube. The PEM program is in 3 phases; the preliminary engineering phase and the preproduction and pilot production phases. Preventive maintenance on the test equipment was completed. Investigations started on the use of low temperature alloys as a bonding agent between the barrier-grid mesh and the SE surface. Preliminary design was completed for mounting of the collector-amplifier section on a seal ring. An electronic evaporator was ordered and service installations were completed. (Author)

Document Details

Document Type
Technical Report
Publication Date
Oct 31, 1961
Accession Number
AD0266875

Entities

People

  • J.m. Abraham

Tags

DTIC Thesaurus Topics

  • Engineering
  • Low Temperature
  • Low Temperature Alloys
  • Maintenance
  • Preventive Maintenance
  • Production
  • Production Engineering
  • Storage Tubes
  • Test Equipment

Fields of Study

  • Engineering
  • Physics

Readers

  • Electronics Engineering
  • Software Engineering

Technology Areas

  • Microelectronics