MONTHLY ACCESSION LIST 52
Abstract
I DENTIFIERS: Atlas, Centaur. Instructions are provided for conducting a final c eckout of the co plete telemetering system on an assembled missile and is to be used in conju ction with the 27-5072 telemetering checkout trailer This checkout is required: (1) upon completion of installation of the telemetering system on missiles covered by this procedure; (2) following alteration or repair of any part of the telemetry system (only checkout portionAFFECTED); and/or (3) following any relocation or di urb nce of issiles cov red by this procedure. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 15, 1961
- Accession Number
- AD0267161
Entities
Organizations
- Battelle Memorial Institute