PRODUCTION ENGINEERING MEASURE ON HIGH PERVEANCE CATHODE RAY TUBES

Abstract

Efforts are b ing made to es ablish c hode ray tube designs suitable for quantity production and to establi h a limited manufacturing facility capable of producing 200 gross focus reflex modulation tub s p r month on a single shift basis. I ITIAL DESIGNS ARE PR ENT D FOR THE Z-4809 focus reflex modulation cathode ray tube. Component parts were ass mble , n ces ary laboratory tooling accomplished and experimental tubes were constructed. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 08, 1961
Accession Number
AD0268664

Entities

People

  • Edward T. Rate

Organizations

  • General Electric

Tags

DTIC Thesaurus Topics

  • Buildings And Structures
  • Cathode Ray Tubes
  • Engineering
  • Manufacturing
  • Manufacturing Engineering
  • Modulation
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Research Facilities

Fields of Study

  • Physics

Readers

  • Electronics Engineering
  • Snow Cover Descriptors for Reptiles and Their Illustrations.