PROTOTYPE DEVELOPMENT MODEL 385 AIR REFUELING STORE

Abstract

Development of the Beech Model air refueling hose has continued with satisfactory progress in all areas except correction of previously reported clutch deficiencies during this interim period. The first prototype is complete to the extent possible without satisfactory clutches. The second unit is ready for static test and the third unit is progressing satisfactorily. The first unit is now thirteen days behind schedule due to the current clutch problems. No other major problems have been encountered. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jan 08, 1962
Accession Number
AD0269814

Entities

People

  • C.v. Lassmann

Tags

DTIC Thesaurus Topics

  • Deficiencies
  • Models
  • Prototypes
  • Refueling
  • Static Tests

Readers

  • Aerospace Engineering
  • Aerospace logistics and air mobility.
  • Software Engineering