PRODUCTION ENGINEERING MEASURE TRANSPARENT PHOSPHOR, HIGH RESOLUTION CATHODE RAY TUBES
Abstract
A PLANNE PRODUCTION ENGINEERING PROGRAM IS E CRIBED WHICH AS DESIGNED TO PROVIDE A CAPABILITY FOR THE ACTUAL PRODUCTION OF TYPE GL 4683 PZB cathode ray tubes at a rate of 50 complete t es per month. A s mation is given of t e work done in providing an adequate facilit trained personnel an pr per pr cess proced res an controls. (A thor
Document Details
- Document Type
- Technical Report
- Publication Date
- May 31, 1961
- Accession Number
- AD0270263
Entities
People
- W.j. Noroski
Organizations
- General Electric