PRODUCTION ENGINEERING MEASURE FOR VARIABLE CAPACITOR DIODES

Abstract

The design of the SCS-61 was established to the point of practical and economical operation. The pilot run to date on this device has tended to establish the production capability. The demonstration of the capability will be documented after completion of the pilot run. The recent negotiations to the SCS-62 have enabled the adjustment to the SCS-62 process parameters such that the SCS-62 is now a practical operation. The SCS-62 pilot run will establish the production capability of that device. These processes can and will continue to be improved to produce higher yields than presently achieved. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 30, 1961
Accession Number
AD0271728

Entities

People

  • R.n. Clarke

Tags

Communities of Interest

  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Capacitors
  • Demonstrations
  • Electronic Components
  • Engineering
  • Negotiations
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Variable Capacitors

Readers

  • Economics
  • Software Engineering