SUPERHEATER EVALUATION STUDIES FOR DD931/DD945 CLASS BABCOCK AND WILCOX BOILERS
Abstract
Three ships of the DD931 class experienced tube failures in the superheater third pass. All failures occurred in the same tube row and all boilers inspected revealed similar patterns of fireside corrosion, wall thinning and overheating.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1962
- Accession Number
- AD0275916
Entities
People
- T. P. Tursi Jr.
- W. A. Fritz Jr.