DEVELOPMENT OF TELEGRAPH TERMINAL TH-22(XC-3)/TG

Abstract

Effort on the TH-22(XC-3)/TG progressed from the testing phase to the construction phase. All circuits were designed and temperature tested. One engineering prototype was assembled and system tested. Chassis and front-panel modifications were incorporated. Design of all parts was completed. Two Service Test Models were assembled, debugged, and system tested. (Author)

Document Details

Document Type
Technical Report
Publication Date
Feb 28, 1962
Accession Number
AD0275947

Entities

People

  • R. Cquturier

Tags

DTIC Thesaurus Topics

  • Construction
  • Engineering
  • Models
  • Prototypes

Readers

  • Computer Science/Computer Engineering/Data Science/Digital Signal Processing.
  • Software Engineering