OPERATIONS CENTRAL AN/MSQ-19 ( )

Abstract

In systems engineering, primary effort has centered upon the assembly and test of an AN/MSQ- 19 system consisting of one item of each major unit. In programming and applications, a system utilizing situation material from exercise LUCKY ECHO was completed and tested. In display equipment, the Overlay Generator and Console Display units were integrated into system tests. Problems uncovered during test of the Overlay Generator have been corrected or are being corrected. In data processing equipment, GRAPHDEN No. 1 and the Overlay Generator Controls No. 1 were completed and integrated into the system tests. In the area of housing and transportation, work continued on the Screening Annex van, the Communications Service Center van, and the Maintenance van. All remaining major procurements for housing and transportation items were completed. (Author)

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1962
Accession Number
AD0277848

Tags

DTIC Thesaurus Topics

  • Assembly
  • Computer Programming
  • Data Processing
  • Data Processing Equipment
  • Engineering
  • Generators
  • Maintenance
  • Materials
  • Processing Equipment
  • Procurement
  • Systems Engineering
  • Transportation
  • Vans

Readers

  • Aerospace Test and Evaluation
  • Human-Computer Interaction (HCI).