PRODUCTION ENGINEERING OF THE M40 (T10) TEST SET
Abstract
A study was made to outline the processes used in the production of the M40 (T10) test set, to illuminate any difficulties encountered, and to suggest changes that will facilitate assembly. It appears that the test set will be procured in lots of ten thousand to twenty thousand which is a relatively low production figure. No consideration is given to the design of the test set. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1960
- Accession Number
- AD0283617
Entities
People
- M. Garrity