PRODUCTION ENGINEERING MEASURE TRANSISTOR, VHF, SILICON, POWER (5W-70MC)

Abstract

Pilot line operation was established in all areas of fabrication. Processes are geared to production quantities for preparation of pre-production samples with a gradual increase toward the pilot production rate needed to produce the 2,000 pilot production samples. The 100 pre-production samples were assembled and evaluation of the devices has begun. A test schedule for evaluation of the samples was prepared and submitted. the fabrication processes are discussed and the material flow is presented. (Author)

Document Details

Document Type
Technical Report
Publication Date
Aug 31, 1962
Accession Number
AD0290771

Entities

People

  • D. Treleaven
  • R. Clarke
  • W.m. Wilson

Tags

Communities of Interest

  • Advanced Electronics

DTIC Thesaurus Topics

  • Engineering
  • Fabrication
  • Manufacturing Engineering
  • Materials
  • Production
  • Production Engineering
  • Production Management Methods
  • Production Rate
  • Productivity
  • Test And Evaluation
  • Transistors

Readers

  • Geotechnical Engineering.
  • Software Engineering