7486 CERAMIC TRIODE, PRODUCTION ENGINEERING MEASURE
Abstract
The ceramic triode production engineering measure is discussed. Objectives are: (1) to provide improved vacuum exhaust equipment for processing 7486 tubes; (2) to improve tube ratings by evaluation on new test equipment; (3) to increase tube life expectancy by improved tube design features; and (4) to demonstrate 100 tube per day production capability. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 30, 1962
- Accession Number
- AD0290791
Entities
People
- J.d. Marshall
Organizations
- General Electric