7486 CERAMIC TRIODE, PRODUCTION ENGINEERING MEASURE

Abstract

The ceramic triode production engineering measure is discussed. Objectives are: (1) to provide improved vacuum exhaust equipment for processing 7486 tubes; (2) to improve tube ratings by evaluation on new test equipment; (3) to increase tube life expectancy by improved tube design features; and (4) to demonstrate 100 tube per day production capability. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 30, 1962
Accession Number
AD0290791

Entities

People

  • J.d. Marshall

Organizations

  • General Electric

Tags

DTIC Thesaurus Topics

  • Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Test And Evaluation
  • Test Equipment

Readers

  • Electronics Engineering
  • Software Engineering