PRODUCTION FACILITIES FOR MULTI-TURN METAL-FILM TRIMMER RESISTORS PER SIGNAL CORPS TECHNICAL REQUIREMENTS
Abstract
Assembly and production tooling has proceeded to the point of completion with minor exceptions. All of the preproduction component parts have been received and subjected to incoming quality inspection. These component parts have been assembled into various sub-assemblies using the assembly tooling, and changes improving compoving component quality and facilitating assembly have been proposed. Arrangements have been made with our Quality Acceptance Group to perform the necessary qualification tests; and as an alternative, we have discussed these tests with a Government Approved outside testing company and have received a quotation. The Quality Acceptance Group will also arrange to perform certain acceptance tests requiring unique environmental conditions. A study of the required acceptance tests has been completed and a testing procedure devised. These test procedures have been discussed with our Laboratory Engineering Group and the required test apparatus was decided upon. Work on the test apparatus has advanced to 33 percent completion and prototype test equipment is being received by Product Engineering.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 31, 1962
- Accession Number
- AD0296887