INFAB PROCESSING OF TZM SHEET
Abstract
Seven extruded billets and two of four ingot sections were successfully impact forged to sheet bar and evaluated. Each of the nine sheet bar was cut into four sections and these were rolled to 0.125 in. intermediate gauge at temperatures from 2000 to 3200 F. A total of 29 pieces of intermediate gauge strip were produced and partially evaluated for soundness and evidence of contamination.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 15, 1963
- Accession Number
- AD0297021
Entities
People
- F.r. Cortes