SERVICE TEST OF CONTROLLER, DIFFERENTIAL PRESSURE, PIPELINE PUMP UNIT

Abstract

Nineteen test items were operated for a total of 1,182 hours at Fort Lee, Virginia and at Hachinoehe POL Storage Area, Hachinohe, Japan, and were satisfactory with respect to familiarization and training, maintenance and safety. The test items were suitable with respect to compatibility with related equipment. The test items were unsatisfactory with respect to operational performance, durability and reliability.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1963
Accession Number
AD0297097

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Engineers
  • Engines
  • Fluids
  • Government Procurement
  • High Pressure
  • Hydraulic Fluids
  • Manufacturing
  • Plug Valves
  • Pol Storage
  • Switches
  • Test And Evaluation
  • Test Equipment
  • Training
  • Training Devices
  • United States
  • Valves
  • Virginia

Readers

  • Aerospace Test and Evaluation
  • Military Training and Readiness Simulation
  • Petroleum Engineering