FEASIBILITY DEMONSTRATION OF ADVANCED ATTITUDE CONTROL SYSTEMS
Abstract
Effort was devoted to accomplishing the following work for the respective tasks: Task 1 - Summarizing the results of the material test program, completing injector and thrust chamber designs, fabrication of the injectors, fabrication of the thrust chambers, design and fabrication of the bipropellant valves, and test cell buildup. Task 2 - Completion of system transient analyses, design of the bellows pumps, completion of a bellows test program, heat exchanger design and fabrication, and system test installation coordination.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1966
- Accession Number
- AD0370862
Entities
People
- A. Friona
- C. M. Brown
- L. Baker
- L. Montanino
- W. Pearson
Organizations
- Bell Aircraft Corporation