LESSONS LEARNED, HEADQUARTERS, 19TH ENGINEER BATTALION (COMBAT) (ARMY)
Abstract
During this reporting period this organization though organized and equipped as a combat battalion has been engaged in projects normally associated with better equipped construction battalions. The requirements of the command and the lack of major tactical activity in the immediate area have contributed to this situation. Primary projects have been the construction and erection of a pipeline and POL Tank Farm Facility; the earth moving, concrete work, and vertical erection of a major COSTAR installation; the earth work, concrete, and erection activities associated with a twenty quonset PX complex; and numerous lesser projects to include route maintenance, bridge repair, hauling fill as required, and road and heliport construction to include grading, finishing, and penepriming for dust control.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 13, 1966
- Accession Number
- AD0386083
Entities
Organizations
- Adjutant General's Corps