LESSONS LEARNED, HEADQUARTERS, 34TH ENGINEER GROUP (CONST).
Abstract
During the reporting period, the 34th Engineer Group (Construction) was located at Vung Tau, Vietnam (YS 295465). The major activities of the Group included: Base construction, combat support to Second Field Force Vietnam (II FFORCEV) tactical operations, airfield and land lines of communication (LOC) upgrading and the takeover of RMK-BRJ projects and equipment as the contractor phased down. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 10, 1967
- Accession Number
- AD0386903
Entities
Organizations
- Adjutant General's Corps