PRODUCTION ENGINEERING MEASURE TO IMPROVE PRODUCTION TECHNIQUES AND INCREASE THE RELIABILITY OF THE 2N1358A TRANSISTOR
Abstract
Efforts were continued to improve the reliability of the 2N135A transistor by specific improvements of manufacturing techniques. The Mile stone II test completed 1,000 hours on test and the results are tabulated and included. Also, additional manufacturing test results and special step-stress results are reported. The failure analysis program has continued to yield information as to the nature of failures and provides a quantitative measurement of the various failure modes. In the analytical empirical surface study program additional experiments and results are providing insight into the influences of various processes. One of the substitute programs is predicated on these results.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 30, 1963
- Accession Number
- AD0403125
Entities
People
- J. C. Kuhns
Organizations
- General Motors