PRODUCTION ENGINEERING MEASURE TO IMPROVE PRODUCTION TECHNIQUES AND INCREASE THE RELIABILITY OF THE 2N1358A TRANSISTOR

Abstract

Efforts were continued to improve the reliability of the 2N135A transistor by specific improvements of manufacturing techniques. The Mile stone II test completed 1,000 hours on test and the results are tabulated and included. Also, additional manufacturing test results and special step-stress results are reported. The failure analysis program has continued to yield information as to the nature of failures and provides a quantitative measurement of the various failure modes. In the analytical empirical surface study program additional experiments and results are providing insight into the influences of various processes. One of the substitute programs is predicated on these results.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 30, 1963
Accession Number
AD0403125

Entities

People

  • J. C. Kuhns

Organizations

  • General Motors

Tags

DTIC Thesaurus Topics

  • Assembly
  • Barium Oxides
  • Construction
  • Engineering
  • Fabrication
  • Failure Analysis
  • Failure Mode And Effect Analysis
  • High Temperature
  • Life Tests
  • Manufacturing
  • Materials
  • Measurement
  • Production
  • Production Engineering
  • Reliability
  • Test And Evaluation
  • Transistors

Fields of Study

  • Engineering

Readers

  • Aviation Safety and Air Traffic Management
  • Software Engineering
  • Systems Analysis and Design