PRODUCTION ENGINEERING MEASURE FOR ROLLED CERAMIC CAPACITORS

Abstract

The method of electroding was changed from transfer wheel to silk screening during the reporting period. The operation of the silk screen machine was evaluated and sample units were, and are being, made using the existing equipment. These units are being evaluated to check the performance of the different pieces of equipment.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 09, 1963
Accession Number
AD0403453

Entities

People

  • S. H. Thompson

Tags

Communities of Interest

  • Ground and Sea Platforms
  • Human Systems

DTIC Thesaurus Topics

  • Capacitors
  • Ceramic Capacitors
  • Contracts
  • Electrodes
  • Electronic Components
  • Engineering
  • Engineers
  • Fabrication
  • Government Procurement
  • Life Tests
  • Manufacturing
  • Mass Production
  • Materials
  • New Jersey
  • New York
  • Production
  • Production Engineering

Readers

  • Aerospace Test and Evaluation
  • Clinical Trial Research.
  • Electrical Engineering