TEST PLAN FOR EVALUATION OF PHASE I RTS ATTACHMENT BOND SYSTEM SEQUENCE 1, WING VI STRUCTURAL PROGRAM
Abstract
Evaluation was made of a suitable bonding system for attachment of the Phase I Reverse Thrust package to the Stage III chamber. Preparation and installation of the components are discussed and illustrated in this report. Hydrotest and pressurization sequence, pressure rate, and elapse time are presented.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 10, 1963
- Accession Number
- AD0404008